Phase 2 - Platform Development
EDSD = platform stable · EDM = fee/burn & governance · PoV / EMT / One-Claim / Locked→Unlocked EDSD as defined
Context
Q1–Q3 2025: presale contracts and marketing only; no platform build
EDM presale operations: KYC for investors, brand/partner pipeline, case-study content
Q4 2025 — Foundation Kick-off
L2 testnet: OP-stack with blobs (EIP-4844), Paymaster (EDM/EDSD), bridge & explorer skeleton
PoV layer: Attestor Registry (roles/keys/SLAs), PoV Gate (PASS/FAIL with clear codes), One-Claim (atomic reserve→finalize), Revocation (narrow freezes)
Settlement path: EMT mint → Locked EDSD → Unlocked EDSD flip; Fee Router/Burner posts fee & burns exactly 50% in EDM (hash on receipt)
Canonicalization SDK + hashing libs: server rejects drift and returns canonical bytes
EDSD treasury scaffold: ~75% Locked EDSD in short-dated T-bills / 25% cash; daily PoR job (hash anchored on-chain)
Exit gate: Testnet vertical: Pre-Ship PASS → EMT → release with burn hash & proof page. Audit booking locked; audit pass #1 planned for Q1 2026.
Q1 2026 — Core Rails Alpha
Mainnet-alpha (L2): block ~2s, batches to L1 in minutes, forced-inclusion & permissionless exits, status page (block delay, batch lag, inbox depth)
Trade marketplace (alpha): B1 RFQ & Bids → B2 Award → B3 Fund the Order (prefund first milestone + fee; must-fund before shipping) → B4 Proof→EMT→Release (default 20/60/20), receipts with burn hashes
Tokens marketplace (alpha): PoV-minted Energy/Carbon; list/buy/retire; 4% fee & 50% EDM burn at settlement/retirement
EDSD PoR (daily): public summary + reserve ladder
ETT (proof-only) & CLE (reward) contracts: ready where required
Exit gate: Pre-prod orders (3–5) end-to-end; 100% burn coverage, EMT→release p95 ≤ 15s, PoR daily 100%.
Q2 2026 — Pilot-Ready & Compliance
Exceptions/Disputes (B5): Dispute Pack, variance math (short-shipment/damage/shelf-life), re-inspection flow; Revocation SLA enforced (freeze narrowly; resume on corrective EMT/mirror)
Compliance stack live: KYC/KYB/AML, sanctions, wallet allowlisting; attestor SLA dashboards
Partners: Attestor MoUs (SGS/Intertek/BV), one carrier, one warehouse; lane checklists signed
Exit gate: Pilot-ready: documentation, SDKs, sandbox; 5–10 dry-run orders; ops drills (forced-inclusion, failover).
Q3 2026 — Production Pilot
Live orders: 10–20 live orders (Trade) + token retirements (e.g., 500 t) with receipts and burn hashes on every event
Device-bound evidence: Merkle temp roots + inclusion proofs; EXIF checks on seal photos
Governance Phase 1 (ParameterDAO): EDM-holder votes on bounded params (review window 0–4h, top-up deadlines, payout bands, tolerance tables) and treasury-half splits; 72h timelock; public diffs
Exit gate: KPIs green: disputes ≤ 3 / 100 gates; false-blocks ≤ 1%; duplicate block rate > 99.9%; daily PoR 100%; EMT→release p50 ≤ 5s / p95 ≤ 15s.
Q4 2026 — Optimize & Expand
Performance tuning: explorer & proof pages production-grade; ledgers CSV/PDF; ERP/TMS/WMS webhooks stable
Schema upgrades: new examples/test vectors + deprecations (forward-only)
Registry Mirror: add a second carbon/energy program; First-Seen rules enforced
Governance Phase 2 (ProgramDAO): scope (attestor allowlists, fallback quorums, registry/bridge keys) while constitutional rules remain fixed
Exit gate: Capacity 100–300 orders/month; burn/fee ledger audited; attestor SLA leaderboard public.
Deliverables by end of Phase 2
Optimistic L2: blobs, forced-inclusion, permissionless exits; explorer + status pages
PoV layer enforcing admissibility: Attestor Registry, PoV Gate, One-Claim (atomic), Revocation (narrow)
Marketplaces: Trade B1–B4 (+ B5), must-fund before shipping, Locked→Unlocked EDSD only on proof; Tokens list/buy/retire with 4% fee; 50% burn at settlement/retirement
EDSD reserves: daily Proof-of-Reserves (≈75% T-bills / ≈25% cash)
Tokenization framework: Energy/Carbon tokens; ETT (proof-only); CLE (reward)
Governance: active on parameters & treasury-half; burns immutable and out of scope